Prime Minister (PM) Fan Replacement Program 2026 – Complete Step by Step Guide
The PM Fan Replacement Program 2026, launched under PM Shehbaz Sharif, is one of Pakistan’s biggest energy-saving initiatives. The program aims to replace around 88 million old ceiling fans with NEECA-certified five-star DC fans, helping households reduce electricity costs by up to 70% while lowering demand on the national grid.

This long-term scheme, backed by a Rs. 2 billion seed fund approved by the Economic Coordination Committee (ECC) and an estimated total cost of USD 3.5 billion (Rs. 900+ billion) to replace all 88 million fans, is implemented by the National Energy Efficiency & Conservation Authority (NEECA) on an on-bill financing model.
Why the PM Fan Replacement Scheme Matters
- Save Big on Electricity Bills – Energy saver fans consume up to 70% less electricity.
- Eco-Friendly Choice – Lower energy use reduces national grid pressure and carbon emissions.
- Government Subsidy – Affordable through installment plans and PKR 1,500 salvage value credit per old fan.
- Boost for Local Industry – Backed by 30+ manufacturers and 20+ banks in Pakistan.
- Accessible Financing – Pay through simple on-bill installments over 6–18 months.
Program Overview: How It Works
- Registration – Apply online through the eFan portal or mobile app.
- Eligibility Check – The system verifies your CNIC, electricity bill, and payment history.
- Fan Selection – Choose from NEECA-labelled five-star energy saver fans.
- Installation – Approved manufacturer installs the new fans, removes old ones, and credits PKR 1,500 per fan as salvage value.
- On-Bill Payments – The cost is added to your electricity bill and repaid over 6–18 months.
What Happens If You Miss a Payment
Before applying, consumers should be aware of the following consequences stated in the official Terms & Conditions:
- Installments must be paid even if you are disputing your electricity bill in court — no court order, relief, or bill dispute can suspend your fan financing installment
- Missing payments constitutes “wilful default” under the Financial Institutions (Recovery of Finances) Ordinance, 2001
- On default, the bank has the right to repossess your fans
- Your electricity connection can be disconnected until all outstanding financing dues are recovered
- Early termination of financing requires paying all remaining installments in one lump sum — no rebate is given
- The bank can recover dues through any legal mode including third party collection
Eligibility Criteria for Shehbaz Sharif Fan Scheme 2026
- Valid CNIC.
- Electricity bill must be in applicant’s name.
- No more than two late bill payments in the last 24 months.
- Domestic consumers only (residential households).
- Homeowners only – tenants cannot apply.
- Registered SIM must be under applicant’s CNIC.
- Must be an electricity customer for 24 months or more.
- Must be an electricity customer under AJ&K Electricity Department, FESCO, GEPCO, HAZECO, HESCO, IESCO, K-Electric, LESCO, MEPCO, PESCO, QESCO, SEPCO, TESCO.
Benefits of the Energy-Efficient Fan Scheme
- Save 50–70% on electricity bills.
- PKR 1,500 salvage value credit per old fan.
- Wide choice of trusted brands like Super Asia, GFC, Indus, Royal, etc.
- Affordable repayment over 6–18 months.
- Supports government’s energy-saving policies.
Important: Carbon Credits Clause
Carbon Credits — What You Are Consenting To
By applying for the PM Fan Replacement Program, you give full and irrevocable consent to NEECA and the Government of Pakistan to register, aggregate, sell, and manage carbon credits generated from your replaced fans. This is stated in the program’s official Terms & Conditions.
What this means in practice:
- The energy savings from your replaced fans generate internationally tradeable carbon credits
- NEECA and GoP have exclusive rights to monetize these carbon credits
- You will not receive any share of carbon credit proceeds
- The government has committed that proceeds will be reinvested in Pakistan’s energy efficiency and conservation initiatives
This clause is irrevocable — once you accept the T&Cs and apply, this consent cannot be withdrawn. Most applicants are unaware of this clause, so it is worth understanding before you apply.
DC Fan Price in Pakistan (2026 Update)
Under the PM Fan Replacement Program, each NEECA-certified 5-star fan is estimated to cost approximately Rs. 10,500. The total financing available ranges from Rs. 12,000 to Rs. 300,000 depending on your eligibility and the number of fans being replaced — making it possible for households to replace multiple fans in a single application.
Repayment is spread over 6, 12, or 18 months at KIBOR + 2% interest rate, added directly to your monthly electricity bill. For those preferring Islamic financing, Shariah-compliant Musawamah financing is available through approved partner banks.
Documents Required for PM Fan Replacement Program
The application is fully online — no physical documents need to be submitted or couriered. However, you must have the following ready before starting:
- Valid CNIC — issued by NADRA. Must not be expired. Your identity is verified automatically through NADRA’s database.
- Electricity bill reference number — the bill must be registered in your own name. The portal fetches your consumer details and payment history directly from your DISCO.
- Your Electricity bill – (PDF/JPG/PNG, max 2MB)
- Registered SIM card — the mobile number you use to apply must be registered under your own CNIC. An OTP will be sent for verification.
- Old fans at your premises — this is a replacement scheme, not a new purchase program. You must have old inefficient fans installed at your address to qualify.
Tips before applying:
- Note the make and model of each old fan — the portal shows a dropdown list to select from. If your fan’s make or model is not listed, simply select “Other”
- Count the number of old fans in your home — the portal will ask for this to determine your financing limit
- Take clear photographs of your old fans beforehand — the system will ask you to upload snapshots during the application
- Once Replacement Fan Quantity is Added, It cannot change later — decide carefully before confirming.
How to Apply for Fan Replacement Program in Pakistan
Here’s a step-by-step guide for applying under the NEECA fan replacement program 2026:
Step 1 — Register and Log In Visit efan.gov.pk or download the mobile app from Google Play Store or Apple App Store. Create your account using your CNIC and registered SIM number. An OTP will be sent for verification.

Step 2 — Select Your DISCO and Verify Bill After login, select your electricity company from the dropdown. The portal supports all DISCOs including HAZECO, LESCO, MEPCO, FESCO, GEPCO, IESCO, HESCO, PESCO, QESCO, SEPCO, TESCO, K-Electric, and AJ&K Electricity Department. Enter your bill reference number and click Verify. The system automatically fetches your consumer details — name, CNIC, meter number, installation date, and address — directly from your DISCO.


Common Error: If you see “Applicant CNIC did not match with Bill CNIC” — your CNIC on the electricity bill does not match your NADRA CNIC. Visit your DISCO’s customer services center to update your CNIC before applying.
Step 3 — Upload Your Electricity Bill The portal asks you to upload a copy of your electricity bill. Accepted formats are PDF, JPG, and PNG — maximum file size 2MB. Keep a digital copy ready before starting your application.

Step 4 — Add Existing Fans This is the most important step. Click “+ Add Fans” and for each old fan:
- Select the fan brand from the dropdown (GFC, Akbar, Al-Noor, Mefco, Climax, Belvin, Mehran, Parwaz, Royal, Alrehmat, and others)
- If your brand is not listed, select “Others”
- Select quantity
- Upload a photo of the old fan (JPG, PNG, JPEG)

Critical Warning: Once you confirm fan quantity it cannot be changed later. Double-check the number of fans before clicking Next.

Each old fan carries a fixed salvage value of Rs. 1,500 which is deducted from your total financing amount. The old fan will be handed over to the vendor as partial payment under the Musawamah agreement.
Step 5 — Bank Details Select your mode of financing — Islamic (Musawamah) or conventional. Then select your city and tehsil to see available banks in your area. Confirmed participating banks include Al Baraka Bank, Askari Bank (AKBL), Bank Alfalah, Bank of Punjab (BOP), Habib Bank Limited (HBL), and MCB — with more available depending on your location. Select your preferred bank and proceed.

Step 6 — Vendor Info and Agreement The portal assigns a registered vendor/manufacturer for your area. Review the full Terms & Conditions carefully — particularly the carbon credits clause and default consequences covered above. Once you accept the agreement your application is submitted. The manufacturer will contact you within approximately 30 days to schedule installation.
After Application — Track via Dashboard Log back into efan.gov.pk anytime to:
- View your application status under “My Request”
- Track your order under “Order Tracking”
- Receive SMS updates at every stage
Step 7 — Installation & Verification The assigned manufacturer visits your home to install the new NEECA-certified 5-star fans. During the visit:
- Your old fans are removed, photographed, and permanently disabled — they cannot be reused or resold
- New fans are installed and photographed for verification
- You pay installation charges directly to the manufacturer — Rs. 1,000 for the first fan and Rs. 800 for each additional fan
- Rs. 1,500 salvage value per old fan is credited and adjusted in your financing amount
- After installation, confirm completion through the NEECA Online Portal (NOP) to officially activate your financing
Step 8 — Payments & Monitoring From the next billing cycle, your monthly fan installment appears as a separate line item on your electricity bill. Repayment runs over your chosen period of 6, 12, or 18 months. Track your application anytime via the eFan portal or mobile app — SMS notifications are sent at every stage.

For help call 1797 or email support@efan.gov.pk.
FAQs on the PM Fan Replacement Program 2026
1. Who is eligible for the Prime Minister Fan Replacement Program?
Applicants must hold a valid CNIC, have an electricity bill in their name, use a registered SIM, and have no more than two delayed bill payments in the last 24 months. Only domestic consumers who own their property are eligible.
2. How do I apply for the Fan Replacement Program in Pakistan?
Register via the eFan portal or app, confirm eligibility, select NEECA five-star DC fans, and pay through on-bill installments.
3. What is a NEECA-labelled five-star fan?
A NEECA five-star fan is an energy-efficient DC fan certified to use up to 70% less electricity than standard models.
4. What does on-bill financing mean?
The cost of your new energy saver fans in Pakistan is divided into monthly installments and added to your electricity bill.
5. Can I apply if my electricity bill is not in my name?
No. The electricity bill must be in your name to apply for the Shehbaz Sharif fan scheme 2026.
6. If I own multiple properties, can I apply for each one?
No. Each person can only apply once for a single property under the fan replacement scheme Pakistan.
7. Can I get energy-efficient fans without replacing old ones?
No. The scheme requires replacement of old fans with DC energy saver fans.
8. What is the salvage value of my old fans?
Each old fan carries a salvage value of PKR 1,500, credited toward your new fan purchase.
9. Are installation charges included?
No. Installation costs are PKR 1,000 for the first fan and PKR 800 for each additional fan.
10. Can I just buy a new fan without replacement?
No. The Prime Minister Fan Replacement Program is strictly a replacement scheme.
11. Which address will be used for installation?
Fans are delivered and installed at the address listed on your electricity bill.
12. Can tenants apply for this scheme?
No. Only homeowners with bills in their name are eligible.
13. Do I need an old fan to apply?
Yes. The scheme is only for replacing existing fans.
14. Can I apply if my bill is in a family member’s name?
No. The bill must be under the applicant’s CNIC.
15. How long must I be an electricity customer?
At least 24 months of electricity bill history is required.
16. What if I have delayed bill payments?
Up to two delayed payments in the last 24 months are allowed. More than that makes you ineligible.
17. Can I replace multiple fans under this scheme?
Yes, within your financing limit, which depends on your monthly bill.
18. Can I apply again after completing my first installment plan?
The program currently allows one application per property. There is no publicly confirmed reapplication policy at this time. Check efan.gov.pk or call 1797 for the latest updates on reapplication eligibility.
19. How are installment payments made?
They are added to your monthly electricity bill over 6–18 months.
20. How can I track my application status?
Use the NEECA eFan portal or mobile app. SMS updates are also sent.
21. How will I know if my application is approved?
You’ll receive a confirmation SMS and see updates in your account.
22. Can I withdraw my application after approval?
No. Once approved, the replacement and repayment process begins.
Final Thoughts
The Prime Minister Fan Replacement Program 2026 is a game-changer for Pakistan’s energy sector. By replacing old ceiling fans with NEECA five-star DC fans, households can save thousands on electricity bills, contribute to national energy savings, and help build a sustainable future.
If you are a homeowner in Pakistan, this is the best time to apply for the Shehbaz Sharif fan scheme and upgrade to energy saver fans for a greener tomorrow.

Kia Jo phyly Wala fan Hoga wo mery pass rahy ga hakomat ly ly gi
Wo Govt. le le gi us ki qeemat new fan ki qeemat se minus ho jai gi.
Pleaz give me repleas fan
Assalamualaikum Muhammad Karamat,
Please explain your issue in a little more detail so we can guide you properly
If you are asking about the PM Fan Replacement Program, kindly mention your problem or question clearly.
Note: We are an informational website only and not officially connected with any government department.
Assalamualaikum Muhammad Karamat,
Please explain your issue in a little more detail so we can guide you properly
If you are asking about the PM Fan Replacement Program, kindly mention your problem or question clearly.